For Instruments with serial numbers MBT2020 and later, self-install:
- Checks for leaks for channel 5, the priming reservoir.
- Pressurizes all five channels to 8 PSI for 10 minutes.
- After ~1 minute, turns on UV light and checks for functionality.
- After ~1 minute, turns on the High Voltage Board and checks for functionality.
- Stops if any errors are reported.
- If 10 minutes elapses without errors, it exits and creates a log file.